P&S Property Services called in the Hooka today to help with their project. Without space for a handler in the road and a temporary scaffold roof a conventional handler wasn’t an option.
The spliced steels supplied by Beamline Steels weighed 1200kg each and were assembled on the floor for safety and then lifted into position.