United Kingdom Australia United States

Lifting and Installing an Electric Vehicle Charger in a Restricted Space

It was a slightly different call-out for the Hooka team this week, working alongside Craig and Ian from Elm Park Electrical, installing an Electric Vehicle Charger on behalf of BP.

The Hooka’s ability to install infrastructure where there is not enough set-up space for large lorry cranes makes it ideal for working around city centres, in underground car parks, or where there are overhead hazards such as electrical or telephone cables.

On this occasion it was trees in the pub car park creating the obstruction and the first challenge was to secure and then gently lower the existing 260Kg charger, which had been badly damaged and was tilting at precarious angle, having been reversed into by a lorry.

Then it was simply a case of gently transporting and precisely lowering the replacement module directly onto the existing mounting points.

Another install safely and smoothly completed.

Lift and Shift Bulky Items in Restricted Access Sites

The Steel Beam Lifter Team make good use of the capabilities of the Hooka mini tracked crawler handler, with it’s compact size and great lifting strengths we not only install steel beams, but other potentially difficult to move items that are delivered to the kerbside and need moving and installing in areas where large machines simply can’t reach.

The safest, easiest and fastest way to move bulky items

Steel Beam Lifter Team and Hooka Mini Crawler Handler Lifting and Shifting Spa
Steel Beam Lifter Team and Hooka Tracked Crawler Handler installing Fuego Pizza Ovens
Transporting a Solid Marble Bench in London
Lifting Backup Power Supply Modules on a Tight Site in Bradford